The City of Hesperia, in cooperation with the County of San Bernardino, selected Angenious Engineering Services to provide construction management services for the Ranchero Road Corridor Widening, which consists of various improvements on Ranchero Road: corridor widening from existing 2-lane to an interim 4-lane that starts from east of Mariposa Road to Seventh Avenue, relocating 2.8 miles waterline, 4 reinforced concrete box (RCB) drainage culverts, Union Pacific Railroad (UPRR) crossing, 3 traffic signals; including total reconstruction of the California Department of Water Resources (DWR) Aqueduct bridge to an ultimate 6-lane corridor from Kern Avenue (east) to the new Russell Court.